翻訳と辞書
Words near each other
・ Jakarta Fashion Week
・ Jakarta Flood Canal
・ Jakarta Foreign Correspondents Club
・ Jakarta Globe
・ Jakarta gubernatorial election, 2012
・ Jakarta History Museum
・ Jakarta Inner Ring Road
・ Jakarta Intercultural School
・ Jakarta International College
・ Jakarta International Film Festival
・ Jakarta International Java Jazz Festival
・ Jakarta International Korean School
・ Jakarta Islamic Index
・ Jakarta Japanese School
・ Jakarta Kota railway station
Jakarta Kota-Anyer Kidul railway
・ Jakarta Kota-Manggarai railway
・ Jakarta Light Rail Transit
・ Jakarta Love Story
・ Jakarta Marathon
・ Jakarta Mass Rapid Transit
・ Jakarta Monorail
・ Jakarta Open
・ Jakarta Outer Ring Road
・ Jakarta Outer Ring Road 2
・ Jakarta Planetarium and Observatory
・ Jakarta Project
・ Jakarta Slide
・ Jakarta State Polytechnic
・ Jakarta Stock Exchange


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Jakarta Kota-Anyer Kidul railway : ウィキペディア英語版
Jakarta Kota-Anyer Kidul railway

The railway between Jakarta and Anyer Kidul is a railway connecting several places in the province of Banten to Jakarta, the capital city of Indonesia. It was constructed between 1899 and 1900 in the Dutch colonial age, during which it was also known as the Banten railway ((オランダ語:Bantamlijn)).
==History==
The public railway company Staatsspoorwegen built the line in 1899 and 1900 as part of the Western railways ((オランダ語:Westerlijnen)) in order to improve connectivity with the western regions on Java.
On 2 January 1899 the first part was opened between Batavia Zuid (Jakarta Kota) and Tangerang. Until 12 September 1923, this line started from Batavia Zuid, headed west across the street via Pasar Pagi (current day Petongkangan street), turned south to Angke after which the railway followed the current route via Duri. Due to the narrow streets downtown, the new railway from 1923 went around the city on partially elevated tracks. The original plan for this included a rail curve starting from Batavia station going east and curving 180° north- and westwards. Because of the higher costs however, the line was to go east to Kampung Bandan after which trains would have to revert onto the new railway going northwest around the old downtown area. This is the situation as it remains today.〔 Wegener Sleeswijk, F.O. (1929). "Uitbreiding van de spoorwegen in en om Batavia en Tandjong Priok". ''De Ingenieur: Verkeerswezen I'' 2, 1–12.〕
The railway stretch from Duri to Rangkasbitung was completed on 1 October 1899, to Serang on 1 July 1900, and the final extension to Anyer Kidul on 20 December 1900.〔() D. Teeuwen, "Manpower, steam tractions and contact wires" (2010)〕
Part of the railway up to Maja is electrified with 1.5 kV overhead lines.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Jakarta Kota-Anyer Kidul railway」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.